Integration of the Banking Sector into the Offshore Wind Industry •


Kriegers Flak, an offshore electricity transmission grid linking the electricity grids of Denmark, Germany and Sweden and connecting offshore wind turbines at Kriegers Flak with the electricity grids on land. This project received EU Commission approval for €150million in December 2009 and a feasibility study is now in progress.


Complexity of Projects and Associated Construction Risk Offshore projects are more complex and require far more co-ordination and project management than onshore wind projects. Construction techniques that have been in application for a limited time coupled with unpredictable weather conditions contribute to a high level of construction risk. The consequences of potential accidents on project duration can be extremely severe. The fact that offshore wind projects are moving further away from the shore and into deeper waters will pose new challenges for project developers, construction companies and financiers.


However, where this is a will there is a way. Unwillingness to provide wrapped Engineering, Procurement and Construction (EPC) contracts due to different risks and parties involved has led to the construction process being arranged on a split-contract basis. Although negotiating detailed contracts that involve multiple parties can take a long time and is extremely laborious, the example of Belwind offshore wind farm proves an agreement can be achieved. According to one of the participating parties, co-ordination took place between six banks, six equity investors, two large contractors and the bankruptcy administrator of the original developer. Construction risks are also becoming better understood as experience is


increasing. Large industrial players experienced in the offshore industry are now getting involved. In addition, local governments are keen to understand and help the emerging offshore wind industry


Table 1: Project-financed Offshore Wind Farms Project


Princess Amalia


(formerly Q7) Netherlands C-Power


2007, Belgium


Year/Country Capacity Major Lenders Owners 2006, The


120MW Rabobank, Dexia, EKD


Eneco, Econcern


30MW Dexia, Rabobank EDF EN, RWE as mezzanine lender


Innogy,


Dredging and regional investors


Belwind 2009, Belgium 165MW Rabobank, ASN Consortium of


Bank, Dexia, EIB, Belgian and EKF; Rabobank, Dutch investors, PMV as mezzanine including PMV, lenders


Meewind and Rabo Project Equity


Centrica Energy


Boreas portfolio (comprises the Lynn [97MW], Inner Dowsing [97MW] and Glens of Foudland [26MW]


onshore wind farms)


Sources: Dexia, Rabobank, EIB, websites of companies.


2009, UK


220MW Dexia as the Centrica


technical bank Energy within a banking consortium, which included BBVA, Bank of Tokyo- Mitsubishi, BNP Paribas Fortis, Bank of Ireland, Calyon, KfW IPEX Bank, NIBC, etc.


 


 


    


  


   


        


   


  


   


         





       


 


 


      


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124