|
|
|
OSEA2010 |
| 30 Nov - 03 Dec 2010 |
| Suntec City, Singapore |
|
|
|
|

|
Production Operations 1 - PO1 |
|
|
Discipline: Production and Completions Engineering
Level: Foundation
Instructors: Mr. Paul M. Barry, Mr. Gerald R. Coulter, Mr. Alfred R. Jennings, Mr. John Martinez, Dr. Howard L. McKinzie, Mr. Jeffrey S. McMullan, Mr. Manickavasakan Nadar, Mr. William K. Ott, Dr. Jim M. Peden, Mr. Stephen Schubarth, PetroSkills Specialist, Mr. Bill Whitehead
DESIGNED FOR
Petroleum, production, reservoir, facility, drilling and research engineers; geologists; field supervisors and managers; service company engineers and managers
YOU WILL LEARN HOW TO
-
Plan and implement well completions, workovers, stimulation treatments, and routine production operations with an efficiency that increases profits
-
Evaluate the flow capacity of a well
-
Achieve reliable zonal isolation by efficient primary cementing
-
Devise an integrated plan for efficient well completion and treatments
-
Select and plan an appropriate perforating operation using underbalanced or extreme overbalance procedures
-
Ascertain why formations are damaged and how to prevent or correct such damage
-
Find out which stimulation is best and how to perform these jobs
-
Review your current practices to improve well productivity
-
Apply proven technologies and recent innovations in production operations
ABOUT THE COURSE
This course represents the core of our production engineering program and is the foundation for all future studies in this subject. The participant will become familiar with the procedures and techniques that increase production and cut operating costs. The course provides a fundamental and integrated understanding of wells, their design, operation and treatments. This is one of PetroSkills’ most popular courses.
COURSE CONTENT
-
Geological considerations
-
Reservoir fundamentals
-
Well testing
-
Inflow
-
Primary cementing
-
Well Completions
-
Outflow
-
Workover fluids
-
Perforating
-
Completion equipment: tubing, packers, flow control devices
-
Production logging
-
Squeeze cementing
-
Workovers
-
Formation damage
-
Surfactants
-
Paraffin and asphaltene
-
Rock mechanics
-
Hydraulic fracturing
-
Sand control
-
Acidizing
-
Corrosion control
-
Scale deposition, removal, and prevention
|
|
|
|
|
|
| |
 |
06 - 17 Dec 2009
|
| |
 |
Dubai
UAE
|
|
|
|
|
Keywords and Categories:
|
|
|
|